The kitchen units are being installed and storage units are going into the (former) lower classroom.
The flat roof now has a protective covering.
In the basement, much of the new wiring and pipework from the new boiler is in place.
Some of the bricks that were deteriorating have been replaced with ones reclaimed from other parts of the building.