It is now a lot easier to see how the different parts of the
refurbished building will fit together.
The stairs are now on the spiral staircase.

View of the spiral staircase from the ground floor

View of the mid section of the spiral staircase from the upper floor

View of the top part of the spiral staircase
Work continues in the church itself. The porch for the new car park entrance
is now under construction.

The side entrance at the front of the church

Secondary glazing is being added to some of the windows in the church as a fireproofing measure

The framework for the new porch, which will be glazed

The platform at the front of the church
On the Castle Street side, the emergency exit from the hall has a door and light. Outside, the paving stones are being laid.

The emergency exit at the far end of the hall

Looking through the glass screen on to the paving between the church and hall

View of the glass screen and the paved area from Castle Street