Refurbishment news – 24th Oct 2010

It is now a lot easier to see how the different parts of the refurbished building will fit together.

The stairs are now on the spiral staircase.

View of the spiral staircase from the ground floor

View of the spiral staircase from the ground floor

View of the mid section of the spiral staircase from the upper floor

View of the mid section of the spiral staircase from the upper floor

View of the top part of the spiral staircase

View of the top part of the spiral staircase

Work continues in the church itself. The porch for the new car park entrance is now under construction.

The side entrance at the front of the church

The side entrance at the front of the church

New window frame on the inside for secondary glazing

Secondary glazing is being added to some of the windows in the church as a fireproofing measure

Framework for new inside porch area

The framework for the new porch, which will be glazed

Platform at the front of the church

The platform at the front of the church

On the Castle Street side, the emergency exit from the hall has a door and light. Outside, the paving stones are being laid.

The emergency exit at the far end of the hall

The emergency exit at the far end of the hall

View from upstairs through the glass screen on to the paved area

Looking through the glass screen on to the paving between the church and hall

View of the glass screen from outside and the paved area

View of the glass screen and the paved area from Castle Street

This entry was posted in Archive, Refurbishment.