Refurbishment news – 14th Nov 2010

The porch inside the new entrance from the car park has been glazed. More paving stones have been laid on the outside of this entrance.

Glazing in porch at back of church

The porch with added glazing

Paved area outside the car park entrance

Paved area outside the car park entrance

The railings are now back in place having been stripped for repainting.

View of the outside of the church and tower with railings

The railings on the Castle Street side of the church

View between the church and hall on to Castle Street

View between the church and hall on to Castle Street

The spiral staircase is nearing completion now that the handrails are fitted.

The steps leading up to the church

The steps leading up to the church

Bottom of the spiral staircase with handrails

Bottom of the staircase

View down on to the bottom of the spiral staircase with handrails

View down on to the bottom of the staircase

View down on to the spiral staircase with handrails

View down on to the staircase

Top of the spiral staircase with handrails

Top of the staircase

The handrails on the landing at the top of the staircase

The landing at the top of the staircase

This entry was posted in Archive, Refurbishment.